INFRASTRUCTURE COMPONENTS AND LAB INFRASTRUCTURE


INFRASTRUCTURE COMPONENTS

Area (in sq.ft.)
Ready-to-use labs on lease 700,000
Bio-IT 300,000
Incubation Space 100,000
Built-to-suit campus (developed land plots) 21 acres


LAB INFRASTRUCTURE

  • Manifold connection with gas lines
  • Compressed air
  • Vacuum
  • DM water
  • Enclosures for safety showers
  • Effluent drainage and treatment
  • High-speed Internet access
  • Fire detection and protection systems
  • Fail-proof power through dual feeders
  • Micrometeorological center to monitor environment