|
|
|
|
|
|
INFRASTRUCTURE COMPONENTS AND LAB INFRASTRUCTURE
INFRASTRUCTURE COMPONENTS
|
Area (in sq.ft.) |
| Ready-to-use labs on lease |
700,000 |
| Bio-IT |
300,000 |
| Incubation Space |
100,000 |
| Built-to-suit campus (developed land plots) |
21 acres |
LAB INFRASTRUCTURE
- Manifold connection with gas lines
- Compressed air
- Vacuum
- DM water
- Enclosures for safety showers
- Effluent drainage and treatment
- High-speed Internet access
- Fire detection and protection systems
- Fail-proof power through dual feeders
- Micrometeorological center to monitor environment
|
|
|
|